Solve the equation. C- 12 = -16

Answers

Answer 1
I think the answer is -4 sorry if wrong :)
Answer 2

Answer:

C = - 4

Step-by-step explanation:

C-12 = - 16

C = - 16+12

C=-4

*negetive bring to another side is positive


Related Questions

what is the shape of a normal curve in statistics​

Answers

Answer:

oval yeah oval

Step-by-step explanation:

Please help ASAP. Thanks so much

Answers

Answer:

I would say D.) 6

Step-by-step explanation:

The positive side of the graph is the right side of the y-axis.

The line passes through the point (6,0)

Answer: 6

Step-by-step explanation: The x-intercept is the point where the parabola crosses the x-axis and notice that this parabola crosses the x-axis.

In this case, the positive x-intercept is 6.

Help&EXPLAIN
==============

Answers

Answer:

A = 108 in.²

Step-by-step explanation:

The figure can be decomposed into 3 rectangles.

✔️Area of rectangle 1 = L*W

L = 8 in.

W = 6 in.

Area = 8*6 = 48 in.²

✔️Area of rectangle 2 = L*W

L = 10 in.

W = 4 in.

Area = 10*4 = 40 in.²

✔️Area of rectangle 3 = L*W

L = 5 in.

W = 4 in.

Area = 5*4 = 20 in.

✔️Area of the irregular figure = 48 + 40 + 20 = 108 in.²

WILL BRAINLIST IF CORRECT!
Sasha solved an equation, as shown below:
Step 1: 8x = 56
Step 2: x = 56 – 8
Step 3: x = 48

How many solutions does this equation have?

Answers

Incorrect, she should have divided both sides by 8. The answer should be x=7. There is only 1 solution to the equation because x is raised to the first degree. It is not a polynomial equation so there won't be more than 1 answer to the equation.

Incorrect, because when solving 8x=56 you need to divide by 8 on both sides leaving the answer as x=7. Therefore, Sasha is incorrect.

(3x + 3)(2x + 6) =
(2x + 1)(x - 2) =
(x - 3)(x + 4) =
(2x - 4)(x - 5) =
(x + 3)(x + 2) =
(x + 2)(x + 2) =
(x + 3)(x - 3) =
(2x³ + 1)(x - 4) =

Answers

Step-by-step explanation:

step 1. use Foil to multiply the polynomials.

step 2. (3x + 3)(2x + 6) = 6x^2 + 18x + 6x + 18 = 6x^2 + 24x + 18.

step 3. (2x + 1)(x - 2) = 2x^2 - 4x + x - 2 = 2x^2 - 3x - 2.

step 4. (x - 3)(x + 4) = x^2 + 4x - 3x - 12 = x^2 + x - 12.

( 8 x 10^4) - ( 4 x 10^2) give the answer in standard form

Answers

Answer:

7.96x10^4

Step-by-step explanation:

You will get 796000 and you just move the decimal point infront to get 7.96x10^4

Lizzy ran 2/3 of an hour for four days. How many total hours did Lizzy run?

Answers

1/4 miles/ hour.


I hoped it helped

Answer:

Well lizzie stevens from Greys better stop running if she got cancer

Step-by-step explanation:

What equation is the equivalent to 2x^2-24x-14=0

Answers

Answer:

2(x^2-12x-7)

Step-by-step explanation:

What is sum of the vectors, (4.-5) and (10,2)?

(-6, 7)
(14,-3)
(14,7)
(15,6)

Answers

Answer:

(14,-3)

Step-by-step explanation:

To sum vectors, simply sum values at each position.

The sum is (4+10, -5+2) = (14,-3)

it's been a while since i learned this and i think it'll be (14,-3).

A state began an effort to increase the deer population. In year 2 of the effort, the deer population in a state forest was 3,000. In year 4, the population was 4,320.

The explicit rule for the geometric sequence is aₙ =

Answers

Step-by-step explanation:

i guess math is the hardest subject

Answer:

The answer is aₙ = 2,500 (6/5)^n-1

Hope i helped, have a wonderful day! :D

The ratio of swordfish to marlins caught on a deep sea fishing trip was 20 to 15. If 24 marlins were caught, how many swordfish were caught? Complete the ratio table.

Answers

Answer:

39

Step-by-step explanation:

Will the sum of 56+ (-56) be Positive negative or zero

Answers

0 is the answer! U can type it in the calculator

Answer:

zero

Step-by-step explanation:

56+(-56),thus

the negative overcomes the positive,

56-56

0

Jaden earned $54 every nine days based on this information how many days will it take Jaden to earn $96​

Answers

Answer:

it will take her 16 days

Step-by-step explanation:

Thane Company is interested in establishing the relationship between electricity costs and machine hours. Data have been collected and a regression analysis prepared using Excel. The monthly data and the regression output follow: Month Machine Hours Electricity Costs January 2,000 $ 18,950 February 2,400 $ 22,100 March 1,400 $ 14,050 April 2,600 $ 24,100 May 3,300 $ 28,800 June 2,800 $ 23,100 July 3,600 $ 25,300 August 3,000 $ 23,300 September 1,500 $ 16,600 October 3,200 $ 27,100 November 4,200 $ 32,100 December 3,700 $ 28,300 Summary Output Regression Statistics Multiple R 0.960 R Square 0.921 Adjusted R2 0.913 Standard Error 1,545.17 Observations 12.00 Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Intercept 7,465.99 1,566.61 4.77 0.00 3,975.37 10,956.62 Machine Hours 5.76 0.53 10.78 0.00 4.57 6.95 If the controller uses the high-low method to estimate costs, the cost equation for electricity costs is: (Round intermediate calculations to 2 decimal places.)

Answers

Answer:

If the controller uses the high-low method to estimate costs, the cost equation for electricity costs is "Total cost = $5,010 + ($6.45 * Machine hours)".

Step-by-step explanation:

Note: The data needed to estimate costs using the high-low method is merged together. It is therefore sorted before answering the question as follows:

Month          Machine Hours          Electricity Costs

January              2,000                           $18,950

February            2,400                           $22,100

March                 1,400                            $14,050

April                   2,600                            $24,100

May                    3,300                            $28,800

June                   2,800                           $23,100

July                    3,600                            $25,300

August               3,000                            $23,300

September         1,500                             $16,600

October             3,200                             $27,100

November         4,200                             $32,100

December         3,700                             $28,300

The explanation of the answer is now provided as follows:

Step 1: Calculation of variable cost per hour

From the data above, the highest Machine Hours and Electricity Costs occur in November, while the lowest occur in March. Therefore, we have:

Variable cost per hour = (Highest Electricity Costs - Lowest Electricity Costs) / (Highest Machine Hours - Lowest Machine Hours = ($32,100 - $14,050) / (4,200 – 1,400) = $18,050 / $2,800 = 6.44642857142857

Rounding to 2 decimal places as required, we have:

Variable cost per hour = $6.45

Therefore, the variable-cost components using the high-low method is $6.45.

Step 2: Calculation of total fixed cost

The formula for calculating the total cost is given as follows:

Total cost = Total Fixed Cost + Total Variable Cost ................. (1)

Where;

Total Variable Cost = Variable cost per hour * Machine hours at a particular Electricity Costs

Using highest levels of activity and substitute into equation (1), we have:

$32,100 = Total Fixed Cost + ($6.45 * 4,200)

Total Fixed Cost = $32,100 - ($6.45 * 4,200) = $32,100 - $27,090 = $5,010

Therefore, the fixed-cost components using the high-low method is $5,010.

Step 3: Derivation of the cost equation for electricity costs

The cost equation for electricity costs can be obtained based on the total cost function given in equation (1) above, where:

Total Fixed Cost = $5,010

Total Variable Cost = Variable cost per hour * Machine hours = $6.45 * Machine hours

Substituting the values into equation (1), we have:

Total cost = $5,010 + ($6.45 * Machine hours)

Therefore, if the controller uses the high-low method to estimate costs, the cost equation for electricity costs is "Total cost = $5,010 + ($6.45 * Machine hours)".

The point-slope form of the equation of the line that passes through (-4, -3) and (12, 1) is y - 1 = 1/4(x- 12). What
is the standard form of the equation for this line?
X - 4y = 8
x -4y = 2
4x - y = 8
• 4X -y=2

Answers

Answer:

ffffffffff

Step-by-step explanation:

fffffffffffffff

(25 POINTS!) A right triangle was rotated to create this figure. What is true about the axis of rotation? The picture is shown below.
A. It lies on the hypotenuse of the right triangle.
B. It lies on a leg of the right triangle.
C. It is parallel to a leg of the right triangle, but is separate from the right triangle.
D. It is parallel to the hypotenuse of the right triangle, but is separate from the right triangle.

Answers

Answer:

It lies on the hypotenuse of the right triangle.

Step-by-step explanation:

It lies on the leg of the right triangle. Then the correct option is B.

What is Geometry?

One of the first areas of mathematics is geometry, along with maths. It is preoccupied with spatial characteristics including the separation, form, size, and relative placement of objects. A geometer is a mathematician who specializes in shape.

A right triangle was rotated to create this figure.

Since the given figure is a right triangle that has been rotated, the axis of rotation must pass through the vertex of the right angle, which is also the intersection of the perpendicular leg. Therefore, the axis of rotation must lie on the leg of the right triangle.

It lies on the leg of the right triangle. Then the correct option is B.

More about the geometry link is given below.

https://brainly.com/question/7558603

#SPJ2

wat is x in 1/3x - 11 = 5

Answers

=48

Multiply by 1

Add 1 1 11 11

to both sides of the equation

Answer:

The answer is 48

Step-by-step explanation:

First, add 11 to both sides

5 + 11 = 16

1/3x = 16

Next, times 16 by 3

16 times 3 = 48

Check!

1/3(48) = 16

16 - 11 = 5

X = 48

What is the sum of 2 + 0.42 + 1.8?

Answers

Answer:

4.22

Step-by-step explanation:

2 + 0.42 + 1.8 = 4.22

Please mark as brainliest! <3

Answer:

The sum of 2 + 0.42 + 1.8 is 4.22

hope it helps :)

Please help with either of these questions. Put the answer in the comments please

Answers

Answer:

2) distance = 4 km

Displacement = 4 km east

3) distance = 35 km

Displacement = 5 km north

Step-by-step explanation:

2. He runs for 3 km in the east direction and then stops.. He now runs another 1 km in the same direction then stops.. Thus,

Total distance covered = 3 + 1 = 4 km

Total displacement is how far he is from his starting point = 3 + 1 = 4 km east

3) Runs 20km north and then runs 15 km back from starting point.

Thus;

Total distance covered = 20 + 15 = 35 km

Total displacement is distance from starting point = 20 - 15 = 5 km north

Subtracted because an opposite direction was taken after the 20km back to her starting point.

10 minus the product of 5 in the number G is more than 80

Answers

Answer:

10-5g >80

Step-by-step explanation:

10-5g >80

This is the    statment if u want it.

1. How many calories are in the smoothie that
contains 51 grams of sugar?

2. How many grams of sugar are in the smoothie
that contains 250 calories?

Answers

Answer:

responde la pregunta tú sólo déjame en paz

The 51 gram of sugar has 204 calorie and there is 62.5 gram of sugar in 250 calories.

What is a Measurement unit?

A measurement unit is a unit to measure certain quantities.

For example, the mass can be measured in kilograms, length can be measured in meter and time can be measured in seconds.

To find the measurement of a new quantity knows units can be used in operation. As to find the unit for speed we use m/s as a unit, where, m is the unit of distance and s is the unit of time.

Solve these problems using the conversion unit for calorie to gram.

(1) 1 gram = 4 calories

Then, 51 grams = 51 × 4

                         = 204 calories

(2) 4 calorie = 1 gram

    1 calorie = 1/4 gram

    250 calorie = 1/4 × 251

                        = 62.5 gram

Hence, smoothie containing 51 gram sugar has 204 calories and in 250 calories of smoothie there is 62.5 gram of sugar.

To know more about measurement unit click on,

https://brainly.com/question/15402847

#SPJ2

     

Carlos thinks of a number. When he adds 17 to it, the result is 45. What is the number that Carlos thought of?

Answers

28 45-17=28. just simple subtraction

Inverse of functions:

Can someone please help me I’ve been trying to do this answer for the past hour and I still can’t solve it.

Answers

Answer:

I'm not sure sorry!! :(

Step-by-step explanation:

HURRY I NEED HELP ILL GIVE YOU THE BRAINLIEST COME ON PLEASE!!!!!!!!

Answers

The answer is a = 132.93 cm2

Answer:

502.5pi or 1578.1415

Step-by-step explanation:

find area of one triangle (BH divided by 2), then multiply it by two since there are two, then find area of circle(pir^2),  divide in half because it is a semi-circle, add the areas together

Determine whether the given value is a statistic or parameter a survey found at 97% of all respondents have jobs

Answers

Answer:

b) The value is a statistic because it is a numerical measurement describing some characteristic of a sample

What is 11.3 divided by 3

Answers

This can easily be done by dividing the 3 with 11 which gives you the answer below!

Answer:

it's 3.7666 and so on. It's a repeating decimal.

Step-by-step explanation:

Pls give me the answer.

Answers

Answer:

To what question?

Step-by-step explanation:

I NEED EQUATIONS FROM THESE POINTS, PLEASE HELP.

Answers

Answer:

Hey There your answers are in the below!!

Step-by-step explanation:

# 5

M = -5

# 6

= 0

#7

= 180

# 8

= 0

- Me!

what is the remainder for 192,856÷37​

Answers

Answer:

5212 12/37 is the answer

Hopes this helps:

Answer: 5212 with the remainder of 12

It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Answers

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Other Questions
a) John wants to buy a house and is trying to figure out how much money he needs for the down payment. If the housecosts $275,000 and the down payment is 15% of the price of the house, how much will the down payment be? $ For the expression 2 x squared + 28 x + 93 Over (x + 6) cubed, which sum represents the correct form of the partial fraction decomposition? which of the following explains a role of the industrial revolution played in undermining mercantilism the product of 8 and a number is 25 less than twice that number. find the number The provision that allows Congress to makeall laws that they consider necessary andproper is called the A food pantry is making packages. Each package weighs 64 pounds.Here are two situations. For each situation, write and solve an equation to represent the situation, then explain what your solution means in the situation. If you get stuck, try drawing a diagram. (upload your work when complete) 1.Each package contains 4 boxes. Each box contains a 7-pound bag of beans and a bag of rice. 2.The bags of rice are all identical. Each package contains 4 identical bags of rice and a 7-pound bag of beans.Please i rly need this!!!!!!!!! Karen has 12 items in her suitcase. Which is the most reasonable prediction for the total weight of her suitcase? En qu estructura de texto est escrito Un largo camino hacia el agua?Comparar y contrastarSecuenciaDescripcinProblema y solucinCausa y efecto what was the impact of the Mayflower Compact on the colonies What was one change that was made after the Titanic tragedy?No more than 100 people can be on a boat at a time.Ships must have a lifeboat for every person on board.England does not build ships anymore.No boats are allowed to be named the Titanic. Will the sum of 56+ (-56) be Positive negative or zero Rite Bite Enterprises sells toothpicks. Gross revenues last year were $8.0 million, and total costs were $3.9 million. Rite Bite has 1.2 million shares of common stock outstanding. Gross revenues and costs are expected to grow at 4 percent per year. Rite Bite pays no income taxes. All earnings are paid out as dividends. (Do not round intermediate calculations and round your answers to 2 decimal places. (e.g., 32.16))a. If the appropriate discount rate is 14 percent and all cash flows are received at years end, what is the price per share of Rite Bite stock? $35.53b. Rite Bite has decided to produce toothbrushes. The project requires an immediate outlay of $17.5 million. In one year, another outlay of $6.5 million will be needed. The year after that, earnings will increase by $4.7 million. That profit level will be maintained in perpetuity. What will the new stock price be if the project is undertaken? Which factors cause air masses to move in the United States? Check all that apply.prevailing easterliesprevailing westerliesjet streamtrade windsfront just using the words given to complete the text PLZZZZZZ Below is a set of data about temperatures. The range of a set of data is the distance between the lowest and highest value in the set. What is the range of these temperatures 9C3C22C-5C11C15C PLEASE ANSWER ASAP !!! need help please, please make it simple i just need the answer no explination. please solve thanks lovee explain why the civil war ended . 4. EtkinlikAa sevgisini anlatan bir iir yaznz